“风力发电基础底座模板,异形的钢模板定制-建信”详细信息
产品规格: |
不限 |
产品数量: |
1000.00 个 |
包装说明: |
不限 |
价格说明: |
不限 |
查看人数: |
63 人 |
本页链接: |
https://info.b2b168.com/s168-209207745.html |
保定建信模具制造有限公司
风力发电基础底座模板是一种异形的钢模板,它主要是通过底座基础模具生产的预制块一般在在风力
发电的时候、电线杆底部部位使用。风机基础钢模板选用优质加厚钢板焊接成型,加筋板固定,加强
模板硬度,提高模板使用率,风机基础钢模板结构为组合式,拆模简单,工人操作方便。
The foundation base formwork of wind power generation is a special-shaped steel formwork.
It is mainly a prefabricated block produced through the foundation formwork of the
foundation. It is generally used at the bottom of wind power generation and electric
poles. The fan foundation steel formwork is welded with high-quality thickened steel
plate and fixed with stiffened plate to strengthen the hardness of the formwork and
improve the utilization rate of the formwork. The fan foundation steel formwork structure
is combined, with simple formwork removal and convenient operation.
风力发电机能够固定在地面上靠的是使用风力发电基础底座模具浇筑出来是水泥底座,依靠体积
重量巨大的水泥底座来支撑大型风力发电机正常平稳运行。风力发电底座需要使用弧形钢板将整个基
础围住,在圈中放入钢筋并灌入混凝土。基础底座模具的作用就是防止混凝土漏出和固型。
The wind turbine can be fixed on the ground by using the wind turbine foundation base.
The mold is poured out of the cement base. The cement base with huge volume and weight is
used to support the normal and stable operation of large wind turbine. The wind turbine
base needs to use arc steel plate to surround the whole foundation, place reinforcement
in the ring and pour concrete. The function of foundation base mould is to prevent
concrete leakage and solidification.
不同型号的风力发电机会使用到不同尺寸型号的弧形钢板,一般来说规格越大的机器需要越大的底座
。因为规格太大所以钢模板都是拼装而成,叠加到一起直接运输到施工场地进行安装。通常使用4mm厚
钢板加上5*5mm勒紧才可以保证模板不会变形,一套风电基础底座模具需要外围一个大圈加上内部一个
小圈。浇筑完毕待到混凝土凝固后钢模板就可撤走,并把外围混凝土埋在地下,上层安装风力发电机
。
Different models of wind power generation opportunities use arc steel plates of different
sizes and models. Generally speaking, the larger the size of the machine, the larger the
base. Because the specification is too large, the steel formwork is assembled, stacked
together and directly transported to the construction site for installation. Generally,
4mm thick steel plate and 5 * 5mm tightening are used to ensure that the formwork will
not deform. A set of wind power foundation base mould needs a large circle on the
periphery and a small circle on the inside. After pouring, the steel formwork can be
removed after the concrete is solidified, the peripheral concrete can be buried
underground, and the wind turbine generator is installed on the upper layer.
欢迎来到保定建信模具制造有限公司网站,我公司办公地址位于有3000多年历史,文化底蕴深厚,清为直隶总督署—保定市。 具体地址是
河北保定莲池区河北省保定市莲池区百楼乡头台村村北,联系人是冉经理。
主要经营相关产品。
单位注册资金单位注册资金人民币 500 - 1000 万元。